Basement Review Draft policy and other measures for public consultation

Comment ID 251
Document Section Basement Review Draft policy and other measures for public consultation 2- Review of the Core Strategy box1 34.3.62 View all on this section
Respondent The Royal Brompton and Harefie… View all by this respondent
Agent DP9 (Jenny Turner)
Response Date 31 Jan 2013
Comment

3) Revision: Supporting text Para 34.3.62

•    The need to ensure that mature trees are not harmed or put at risk in the long term to make way for a basement development is acknowledged.  We propose however that the option of tunnelling under trees as set out within BS 5837 2012 should be considered on a case specific basis, and not wholly dismissed.  We suggest that this be reworded to allow an element of flexibility in exceptional instances.